Building Permit Applications
Interested in a Building Permit Application?
Please see the Building Permit Application Form (Editable or PDF) below. Complete the application and email it directly to the Chief Building Official for Cockburn Island Township. They can also answer questions about Building Permit fees.
Download Application (PDF)
Download Application (DOC)
Applying for a building permit
To apply for a permit to construct you will be required to provide two sets:
- Completed application with date and signature.
- Drawings of proposed structure including foundation details, structural details, and all elevations.
- If it is a steel or other engineered structure, provide all the drawings from the manufacture.
- Site plan showing where the structure will be located with measurements to All 4 lot lines, as well as to your house/cottage, and any other structure.
Pictures of paperwork are not accepted. PDF format only. Send everything together to avoid delays.
All paperwork can be:
- Dropped at your local Municipal Office
- OR sent via email to CBOwestmanitoulin@outlook.com
- OR mailed to Box 680 Gore Bay, P0P1H0
- OR dropped at the Gordon Barrie Island Township Office: 29 Noble Sideroad.
All payments required, will be payable at the Municipality of record for the build.
Did you know?
- Although a Building Permit is not required for a shed that is 160 sq ft or less, a Zoning Compliance Application is required to be obtained as these structures are an accessory use and cannot be placed on properties without a primary type of structure on the property first.
- A building permit is valid for 2 years and can be renewed for an additional year for $50.
What do I need to apply for a permit?
- A completed application, including schedules #1, 2 and Energy Efficiency Design Summary (SB-10 or SB-12 if applicable)
- A site survey plan showing the location of all existing structures and proposed new construction.
- Construction drawings (from a qualified designer) with sufficient detail (foundation plan, floor plan, cross sections, elevations, details) to determine if the proposed construction will meet the minimum requirements of the Ontario Building Code.
- Septic Approval from the Sudbury District Health Unit if required. PLEASE NOTE Building Permits cannot be issued prior to Septic Approval (If applicable).
How long does it take to get a permit?
A Permit can usually be issued in 10 business days, provided the application is complete, the drawings are adequate, and all other required approvals have been issued. More complex projects may take more time. The Ontario Building Code stipulates the time frame to process an application for construction once all required documents have been supplied and all required fees have been paid.